Handyman Repairs

Installed window unit AC

Installed security door

Installed shaker biomass closet doors

Replaced carpet on stairs with woodgrain luxury vinyl plank and bullnose edge

Installed tile backsplash

Installed hexagon tile on shower floor

All finish work on shower stall

Repaired broken trellis

Repaired broken trellis

Repaired broken trellis

A patio floor under construction with tiles being laid and some tiles still in a bucket, with a partially finished border of patio slabs and a section of mortar or adhesive being prepared for tiling.

A patio area where stone tiles are being laid, with some tiles already in place and others waiting to be installed. Construction tools and equipment, including red tool boxes, a gray bucket, and a black bag, are visible nearby. There is a garden bed with rocks, plants, and decorative statues adjacent to the work site.

Removing fluorescent lights, ceiling drywall and installing recessed can lights

Protecting everything else in the house

patching the ceiling and drywall

midway through the project

almost pau

midway through the project

midway through the project